As a part of station improvement work at Mira Road station, the south-side staircase of the second southernmost Foot Over Bridge (FOB) at Platform No. 1 requires dismantling.
In view of the above, the said staircase will remain closed for commuters from the night of 25th July, 2025. Commuters can use the existing staircases, escalators, and elevators connected to the Middle FOB, North FOB, and South FOB at Platform No. 1 of Mira Road station.
Mumbai News: BMC Sanitation Workers Call Off Strike After Assurances On Job Security, Regularisation Of Contract StaffInconvenience to the passengers is highly regretted.
You may also like
[Watch] WCL 2025: AB de Villiers picks World XI, leaves out Sachin Tendulkar, Rohit Sharma
Blue's Anthony Costa reveals how band have dramatically changed their ways
OK! Olivia Rodrigo Special Collector's Edition Magazine - On Sale Now
Ozzy Osbourne ticked off one dream shortly before his death
New UK driving laws to be introduced soon after being 'fast tracked'